The bed is almost ready!
Well, another week ends with a lot of work done!
The electrical system is complete with three house batteries in addition to the original two start batteries, enough to live a full week boondocking! The only things still missing are solar panels and controller as well as the microwave which will be installed after completing the insulation with expanding foame. But the light is there now! VivalaVida is alive! 😉
Plumbing is also complete except a connection for the filter at inlet of the pump, not yet received. And the rear part of the bed (fixed plateform) is also in place.
Next week, we should receive the aluminum profile that will allow us to install the stove and the upper bed.
And since it was my Birthday today, I had the luxury to enjoy a wallnut cake speciality of Grisons (Switzerland) 😀
Thanks to all who are following this blog! 😉
Comments are Closed